Step by step
The whole job, in the order it happens.
Each sequence covers demolition, plumbing rough-in, substrate, waterproofing, layout, setting and grout. Tick steps off as you go and your progress stays on this device.
010203
Shower
Pan, curb, niche, valve rough-in and waterproofing: the sequence that keeps the ceiling below dry.
9 phases5–8 daysIntermediate
Floor
Deflection, flattening, uncoupling, a layout from the sightline, and joints that move instead of crack.
7 phases3–5 daysBeginner to intermediate
Wall
Vertical work where the layout matters more than the mortar: centering, outlets, corners and trim.
7 phases2–4 daysBeginner
Plumbing reference
The heights that have to be right before tile.
42–48"
Valve center above finished floor
78–84"
Showerhead outlet height
33–36"
Grab bar blocking height
2 3/4–3 1/4"
Typical valve rough-in depth